LOCALON / PRINCIPLES · Public Edition v2.1

What will not change
in ten years.

This document sets out only the principles that should remain unchanged ten years from now, so that LocalON OS can grow into a platform that spreads to 243 local governments and to the world. The Public Edition contains only the chapters of the full text that state principles (Declaration · Scope of Standardisation · Governance · Adoption Standard · People · Expansion · Protection of Local Governments · Document System).

Edition
v2.1 · latest
As of
12 October 2026
Contents
8 chapters · 24 sections
Permanent link
/en/whitepaper/v2.1/
Start reading
01Only three certification conditions

Use the shared foundation · adopt the operating method · adopt the training curriculum. The form of the regional operating organisation is not prescribed.

4-1
02Data belongs to the local government

Payment keys, authentication keys and audit logs are held only by the responsible officials, and data is not used for profit.

2-3 · 3-3
03Free to leave, so worth staying

Agreements include hand-over in standard formats, escrow copies and a replacement-operator takeover test. Succession terms are written into the licence.

4-4 · 2-5

Chapter 0. Declaration

0-1Defining statement

  • "A region runs its own services, and at the same time grows the technology and the people who build those services."
  • One-line summary — "When local people build and run a local everyday-economy platform, the region comes back to life." (Proposal to the Ministry of the Interior and Safety, October 2026)

0-2Definition of success

  • Success means the spread of this platform, not commercial success (decided 28 September 2026)
  • Expansion target — of the 243 local governments (17 metropolitan and 226 basic, Ministry of the Interior and Safety / Statistics Korea e-National Indicators): 3 in 2027 → 15 → 60 → 100 (target)
  • Reference models — Palantir became a platform through a data operating system, field engineers and bootcamps; Mozilla through open standards and a foundation structure. LocalON OS takes from both only "what became a standard", and does not adopt vendor-centred operation.

0-3What this white paper will not change and what it may change

CategoryContent
Will not change① The permanently open areas in Chapter 2 (open common foundation, data standard, integration specifications) ② The permanent free right of use for regional operating organisations ③ Data is owned by the local government ④ The succession clause for code and trademarks if development stops or the company is dissolved ⑤ The 3 certification conditions
May changeThe composition and unit prices of revenue sources, the form of the regional operating organisation, the scope of functional modules, the order of expansion
  • What will not change is written into the licence and the Contributor License Agreement (CLA), not the company's articles of incorporation, so that it holds regardless of changes in governance.

0-4Position of this white paper

  • This white paper contains principles only. Business plans, proposals and presentations quote principles from this white paper; figures, schedules and unconfirmed matters are managed in separate reference documents.
  • The Public Edition contains only the principle chapters. It does not include the economic structure, internal execution procedures or matters under review.

Chapter 2. What LocalON OS Standardises

2-1Four platforms + two execution systems

LayerNameWhat it holds
④ LocalON AIRegion-specific AIRegional data + general-purpose AI → conversation, booking and ordering with the world
③ LocalON OperationsRegional operating systemDivision of roles among local government, the regional operating organisation and the specialist organisation
② LocalON DataRegional data foundationAccumulates service usage data as a relational model
① LocalON CoreCommon service foundationMembers and permissions, products and content, orders, bookings, payments, vouchers, settlement, delivery, civil petitions, facility booking, policies and benefits, tourism
Execution system ①Field EngineeringWorking practitioners build together with local developers and transfer the technology
Execution system ②BootcampA hands-on programme that trains teams to build and run services for their own region
  • If each region builds its own ordering, payment and booking functions, they are built and maintained 243 times. LocalON OS builds them once, and 243 regions improve them together.

2-2Three-layer structure and ownership

LayerManaged byOpennessWhat it holds
① Open common foundationLocalON OS headquartersFully open · permanentOrder state machine, permissions, settlement, monitoring, install/update/backup/recovery tools, synthetic data, automated tests, technical documentation, data standard schema, integration specifications (standard API)
② Regional settings and functional modulesRegional operating organisationChosen by the regionRegional name, design, policy values, service area / tourism and booking, regional commerce, local logistics functional modules
③ Operational controlResponsible local government officialNot openAuthentication keys, payment keys, secrets, residents' personal data and actual transaction data, operational databases, backups, audit records
  • What layer ③ keeps closed is secrets and actual data, not programs. The authentication and payment integration programs are open.
  • The open common foundation separates the processing layer from the external integration layer and publishes the boundary as a standard API. A region can replace a specific layer with its own implementation if needed.

2-3Data standard — regional data relational model

  • Regional AI can only be built when the region can be understood as data. Objects and relationships are stored together.
ObjectMain relationshipsOriginating service
ResidentUse, purchase, booking, applicationAll
Business and shopSales, settlement, support programmesEconomy app, monitoring
Product and serviceProduction, sales, deliveryIndependent store, ordering
Place and tourist siteLinks to lodging, festivals, commercial districtsTourism, booking
Policy and support programmeMatching with businesses and residentsBenefits, civil petitions
TransactionResident↔shop↔voucherPayment, settlement
  • Data governance — the holder of residents' personal data, transaction data, public information and AI training data is the local government. Only aggregated and pseudonymised data is used for analysis and AI. Data is not used for profit. (Proposal to the Ministry of the Interior and Safety, Appendices A19 and A36)
  • The region chooses its integration scope from 4 levels — Local (our region only) / Cross-regional (other regions) / National (all of Korea) / Global (the whole world) (decided 8 October 2026)

2-4Design principles

PrincipleContent
Distributed installationThe open common foundation is installed in each region. Transactions in one living area are processed by that region's installation, and nationwide transactions are not concentrated on one server.
Technology neutralityIt must be possible to build, run and modify the software with free development tools only, without assuming any specific commercial compiler, specific vendor or the participation of a specific individual.
Public-sector adoption standardsPrinciple of applying the e-Government Standard Framework, public security standards (CSAP compliance), separation of access rights, encryption, audit logs, backup and recovery
No holding of prepaid balancesThe open common foundation does not hold or manage prepaid balances. Local currency top-ups and balances are handled by the existing issuing system; the common foundation only sends payment authorisation requests and receives the results.
Integration firstPublic delivery apps, delivery agencies, voucher operating agencies and existing local government systems are integration targets, not competitors. LocalON covers everyday life, public services and sales channels beyond delivery, and orders that come in are passed on to existing apps.
No in-house delivery workforceDelivery staff are not hired directly; LocalON integrates with the networks of local delivery agency branches through a standard API.

2-5Licence and succession

ItemContent
Open licenceThe open common foundation is released under the AGPL, and contributions from both individuals and companies are managed through a CLA (copyright assignment + patent grant) — copyright must be held by headquarters for the succession clause and relicensing to work. The DCO is used only to confirm commits by CLA signatories.
Separation of integration modulesPayment and authentication modules run as separate processes and communicate only across an HTTP/gRPC boundary (to control the scope of licence disclosure obligations).
Permanent free right of useRegional operating organisations are granted a permanent free right of use. Joint ownership of patents and trademarks by local governments is excluded, and a free licence to use them is granted instead.
Succession clauseIf headquarters stops development or is dissolved, the code, trademarks and patents are transferred to an alliance of regional operating organisations or to a public-interest foundation.
ForksForking is guaranteed as a right, but official support (long-term support, security patches, registry listing) applies only to verified versions. When regional improvements are fed back into the common foundation, the maintenance burden moves to headquarters.
Installation channels3 channels: development / stable / long-term support. Regional installations use only stable or long-term support versions, and long-term support is aligned with local government contract cycles.
Release orderSource code release always follows the order "secure the filing date, then release".

2-6What the moat is

  • Open source is not a moat. The AGPL only makes copying easier. Palantir's moat is not its code but ① the ontology applied to customer data → switching costs ② security certifications (FedRAMP High December 2024, IL6 October 2022) ③ domain knowledge accumulated by field engineers; analysts rank ontology-based switching costs first (Morningstar, "After earnings: is Palantir a buy, sell or fairly valued", 13 May 2026).
LocalON OS moatContentWhy it is hard to copy
① Cross-regional connected dataData from N regions built on the same ontology is connected (tourist routes, agricultural products from producing area → consuming area, wide-area circulation of vouchers)A later entrant has to start from 1 region and is not connected to the existing N. The average revenue of Palantir's top 20 customers grew from $24.8M (2019, S-1) to $108M (trailing 12 months to 2026 Q1, 10-Q) because data integration within customers deepened.
② Network of trained peopleEach region has developers whose grade is set by the number of certified successors, and leads move between regionsA competitor can buy the software but cannot buy the people in that region who can fix it. Palantir's Sankar: "Hiring FDEs is in fashion, but the point is to stay close to the hardest problems" (November 2025)
③ Public-sector verified qualificationsOne security verification, listing on the Digital Service Use Support System, Innovative Product designation (sole-source contracts for up to 6 years)Takes new entrants several years. These qualifications are obtained in the name of headquarters.
④ Switching costsWhen vouchers, facility booking, civil petitions and policy coupons are tied into one ontology, the cost of removing one of them equals the cost of replacing the wholeHowever, these switching costs must coexist with the exit-right clause (4-4). The moat is that local governments can leave but choose not to; preventing them from leaving is not a moat but a migration barrier.
  • What is not a moat — feature lists, screens, patents alone, price. These can be copied within 2 years.
  • Order of building the moat — ③ qualifications (by the second half of 2027) → ① connected data (once 3 or more regions are in operation) → ② people (once the first cohort of certified successors is produced) → ④ switching costs (5 or more integrated services per region)

Chapter 3. Organisation and Governance

3-1Roles of the three organisations

OrganisationNatureResponsibilitiesFundingNot responsible for
LocalON OS headquartersFor-profit companyDeveloping, managing and distributing the open common foundation; owning and revising the open rules; holding trademarks and patents and granting free licences; review gate; certification decisions; security response; long-term supportSubscription service fees for the open common foundation (local governments), optional AI tools, sponsorship and donationsDirectly operating regional services; involvement in personnel matters of regional operating organisations
LocalON OS Talent Development InstituteFor-profit (pursuing social enterprise certification)Free education (introduction and concepts), paid education (development and operation — certificate of completion, a qualification once registered as a private qualification), consulting and build support for local governments, running 1-year contract leads, exit advisoryTuition (from educational institutions and national education funds, not from local governments), consulting contractsOwning the open common foundation or trademarks, approving releases, directing the work of regional operating organisation staff, job placement
Regional operating organisationForm chosen by the local government — a regional super-app development social enterprise, a regional cooperative, a regional digital facility management team, or another form (all at the same level)Operating and developing ○○ON (regional instance named after the region, e.g. NajuON); combining, releasing, monitoring and backing up settings and functional modules; on-site support; training successorsLocal government recurring personnel and operating costs, personnel costs from job programmes, transaction fees, advertising and partnerships (retained in the region)Modifying the open common foundation alone, revising rule files, holding payment or authentication keys
  • The "LocalON specialist organisation" in the proposal to the Ministry of the Interior and Safety is headquarters and the Talent Development Institute combined, and the "regional operating organisation" is as shown in the table above.

3-3Governance rules that do not change

RuleContent
Review gatePeople are responsible for 4 things — code review / permission management / security testing / release approval — and these are not delegated to automation. Only contributions that pass the quality gate are merged into the common foundation.
Agent principleAgents produce only materials, drafts and checklists; they do not make decisions. Merging, releasing, signing, contract renewal and completion decisions are made by people.
Separation of authorityPayment keys, authentication keys and audit records are held only by the responsible official, regardless of the form of the regional operating organisation. Final release approval is also given by the responsible official.
Conflicts of interestOwners and executives of the Talent Development Institute, regional operating organisations and affiliated ACs and VCs do not take part in headquarters' certification and review assessments. Staff of the Talent Development Institute hold no more than 1 seat on headquarters' decision-making body.
Personal records stay in the regionPersonal records (grades, scores, certification evidence) do not leave the regional operating organisation. External bodies submit only module-, contract- and training-level records.
Conflict-of-interest registerShareholdings, contracts and family relationships are recorded in a register, and recusal from assessment is applied. The head of a regional operating organisation discloses any interests with the local government on appointment.

Chapter 4. Regional Adoption Standard

4-1Three certification conditions

  1. Use of the LocalON OS backend platform (installation method is free — self-installation or the central hosting route)
  2. Acceptance of the operating method (use copies of the 6 rule files without revising them)
  3. Acceptance of the training method and curriculum
  • If the conditions are not met, only the use of the LocalON name and the certification are suspended. The right to use the source code remains.

4-2Adoption procedure — based on a 12-month pilot

OrderStagePeriodContent
1Install LocalON CoreMonths 1–2Common foundation + regional settings (7 categories: identity, region, policy, economy, operation, legal, integration)
2Form the regional development and operations teamMonths 1–3Regional operating organisation + Bootcamp
3Integrate 3–5 regional servicesMonths 3–6Vouchers, facility booking, civil petitions, etc.
4Build the regional data modelMonths 4–8Relational model + governance
5Resident pilotMonths 6–11Operation in a pilot living area
6Regional AI PoCMonths 9–12Multilingual conversation → booking and ordering
  • Interim review at 6 months · final verification at 12 months. Delivery sequence: months 1–6 web app (3 core services) → months 7–12 native app → from month 13, additional categories
  • 3 delivery types — ① link with an already adopted public delivery app ② link with delivery agencies ③ public circuit delivery. Chosen according to local conditions.

4-3Verification stages 1–6

StageSubject of verificationCriteriaCurrent status
Stage 1Technical implementationA working system in which 6 user roles are connectedMet
Stage 2Regional operationThe regional operating organisation performs settings, releases and support / 30-day repurchase rate of 30% excluding discountsNot started
Stage 3Operating system establishedA follow-on region installs, runs and updates using public documents only / build cost is 50% or less of the first caseNot started
Stage 4Open softwareAt least 1 contribution from an external developer mergedNot started
Stage 5Institutional adoptionAnnual operating costs included as a recurring item in a local government budgetNot started
Stage 6Becoming infrastructure1 scheduled release carried out without the founder, 3 or more regions operating at the same timeNot started
  • 2 preconditions for Stage 3 — ① AI tools can be used in the local government environment (to be confirmed first) ② the switch to self-installation has been completed
  • "Not started" means verification has not yet begun; it is not a result.
  • Judgement bands for the build cost of a follow-on region — 50% or less of the first case: met / over 50% and under 70%: partially met, improve the way settings are applied and retest once within 6 months / 70% or more: not met, redesign the structure

4-413 mandatory agreement clauses

No.ClauseBasis
1Exclusion of joint ownership of patents and trademarks by the local government; grant of a free licence to the local governmentIncheon Metropolitan City case
2Deadline for handing over all data in a standard format at the local government's requestSeoul Metropolitan Government case
3The local government keeps a copy of all source code, settings and documentsChapter 2
4Actual testing of whether a replacement operator can take overChapter 2
5Explicit clause on where interest and income from advance payments belongBucheon City and Gunpo City cases
6Conditions for budgeting operating staff as recurring personnel costs (development staff rotate every 2 years)Chapter 5
7Payment keys, authentication keys and audit records held only by the responsible officialChapter 3
8Contract type by form of regional operating organisation (facility management team operates directly; other forms are commissioned per unit of work); secondment prohibitedChapter 3
9Advance notice period to merchants and residents and return of data if the service is discontinued2-5 succession clause
10Responsible party and complaint handling procedure in case of a transaction disputeSet at agreement
11Sharing of the method for measuring the repurchase rate excluding discounts and of the discontinuation criteriaSet at agreement
12Acceptance of the 3 certification conditions4-1
13The local government does not request individual evaluation records of specific staffChapter 3

Chapter 5. People — Developer Training and Rotation

5-2Division of roles

RoleResponsibilitiesAffiliation
Service ownerPriorities, budget, inter-department coordination, performance managementResponsible official
Technical leadDesign, code review, requesting release approval, technical handoverRegional operating organisation (in the first case, held concurrently by staff hired by the Talent Development Institute)
Operations and securityMonitoring, backup, incident responseRegional operating organisation
Field and customer supportSupport for residents and merchants, merchant trainingRegional operating organisation
Talent and partnershipsLinking regional universities, educational institutions and developers to projectsRegional operating organisation + Talent Development Institute

5-3Education — free and paid

  • The training content is not the grammar of a specific programming language but requirements definition, system architecture design, directing AI tools and running the review gate.
CategoryCourseTargetOutcome
FreeIntroduction, concepts, overviewUniversities, primary and secondary schools, vocational training institutes, local governments, anyoneEducational institutions can run it themselves with open teaching materials
PaidDevelopment course (3 days)Local university students, local resident developers, people wishing to return to the region, instructorsCertificate of completion, eligibility for the qualification exam
PaidOperations course (2 days)Responsible officials, field and customer support staffCertificate of completion
PaidAdvanced operations practice and technical leadDevelopment course graduates, experienced staffCertificate of completion, prerequisite for being granted operating rights
Long-termBootcamp, 6 stagesTeams of 4 · 600 hoursA working service for our region + an operating team
  • Bootcamp 6 stages — Understanding LocalON Core → Regional settings → API and data integration → Regional module development → QA, security and release → Live operation. The outcome of the training is not a certificate but a working regional service.
  • The certificate of completion (a qualification once registered as a private qualification) is "a qualification to teach LocalON OS classes" and is not a hiring requirement. Each regional operating organisation decides its own hiring.
  • Confirmed results — Catholic Kwandong University ANCHOR Project Group, Tium Startup Camp 2026: 8 non-developer teams completed platforms capable of taking payments in a 3-day course / 5-week course for staff of the Korean Patent Attorneys Association: built an AI agent connected to their work database. These results are evidence of the speed of entry into development, not evidence of operation and maintenance capability.

5-4Career path

OrderStagePeriodRules
1Education—Completion of a paid course at the Talent Development Institute or a course at a certified educational institution
2Open-ended employment contract with the regional operating organisation (development roles rotate every 2 years, employment is maintained)2-year cycleNewcomers choose their mentor by application (no assignment). Grade is set only by the cumulative number of certified successors — Developer → Module lead → Development lead. No dismissal; role contracts are renewed every 2 years (renewal selection sheet)
31-year contract lead at the Talent Development Institute1 yearFull advisory for the local government concerned, coaching of successor leads. Advisory on ACs, VCs, HR, investment and career moves
4Exit—Starting a business, changing jobs, heading a new regional operating organisation, corporate or overseas start-ups. The only exception for staying is 1 technical lead
  • Development staff rotate every 2 years as a rule, and gaps are prevented through decision and incident records, successor certification and a 4-week handover overlap. For operations staff, budgeting recurring personnel costs at the time of hiring (open-ended employment contract) is set as an agreement condition.
  • The mentor submits 3 types of successor certification evidence (release logs, incident response records, code review records), and the decision is made by 1 development lead from another regional operating organisation + 1 headquarters reviewer. The terms "pass" and "fail" are not used.

Chapter 7. Expansion and Connection

7-2Lowering adoption barriers — the only means of expansion

  • Headquarters has no authority to make adoption mandatory, so lowering the burden is the only means of expansion.
BurdenResponse
Lengthy contracting proceduresSole-source contracts under the Digital Service Specialised Contract System (on condition of obtaining cloud security certification); sole-source contracts with social enterprises and cooperatives
Difficulty securing initial budgetNo budget for external build costs. Recombining existing job, education and informatisation budgets
No way to verify before contractingSynthetic-data test environment provided in advance; observation of a 30-minute demonstration
Difficulty migrating data when changing providerData transfer specification and handover deadline stated in the agreement
Difficulty self-installingA headquarters-operated hosting (SaaS) route is opened from the first case — listing under the Digital Service Specialised Contract requires SaaS provision. 3 agreement conditions are mandatory: data is owned by the local government, switching to self-installation is possible at any time, and the switching cost is 50% or less of the initial build cost. Self-installation is proven separately in Stage 3 verification.
  • Local government procurement specifications do not name a specific product; they state the requirement as "compliance with an open software licence and the data standard (2-3)" (principle of not specifying particular products or specifications). Eligibility to bid is not limited to certified regional operating organisations.

7-5OpenKorea — connecting to the world

  • OpenKorea (working name, domain openkorea.co.kr secured, trademark OpenKorea OS to be filed) is a national gateway where foreigners search, book and buy from every regional ○○ON instance in the country in one place.
  • A single keyword (ginseng, kimchi) brings up the related regions, festivals, small businesses, lodging and experiences together. It opens an overseas purchasing pipeline for regional products and services so that local farms and shops export directly.
  • A global super-app is not a short-term goal but a long-term direction for expansion after the domestic region-owned model has been verified. Overseas expansion means a regional OS + operating staff for emerging economies — exporting not only the platform but also the people who build and run it and the methods they use.

Chapter 8. Intellectual Property and Legal Framework

8-3Clauses protecting local governments

  • Joint ownership of patents and trademarks by local governments is excluded and a free licence is granted (to prevent a repeat of the Incheon Metropolitan City case).
  • Stated in the agreement — deadline for handing over data in a standard format, local government copy of source code, settings and documents, takeover test by a replacement operator (Chapter 4, 4-4)

Chapter 9. Rules for Revising the White Paper

9-1Document system

DocumentRoleRevision cycle
Master White Paper (this document)10-year principles — scope of standardisation, governance, adoption standard, people, economic structure, expansion, intellectual propertyOnce a year or when a principle changes
Business Logic Framework reference editionThe single source for figures, sources, schedules, unconfirmed matters, prohibited expressions and terminologyRevision proposals reflected weekly
Proposal to the Ministry of the Interior and SafetyProject proposal to central government — 4 platforms + 2 execution systems, 12-month pilotBefore submission
Adoption proposals for each city and countySettings-injection proposals in which only the region name and figures are replacedPer region
A to Z Comprehensive Guide and Execution PlanInternal execution procedures, monthly execution table, risk managementQuarterly
CHARTER · 6 rule files · CLAOrganisational operating rulesPeriodic operation (rule files are owned by headquarters; regions use copies)

9-4Revision history

EditionDateChanges
v112 October 2026First draft — integrated the Business Logic Framework reference edition, the proposal to the Ministry of the Interior and Safety, the comprehensive guide, the governance design and the budget map
v212 October 2026Reflected 12 external review comments — strengthened contradiction decisions, moat, ontology specification, architecture decisions, AI layer, decision rules and verification criteria
v2.112 October 2026Reflected 2nd and 3rd reviews — ownership chain, separation of authority, judgement bands, hosting route, confirmation of headquarters as a for-profit company, expansion population fixed at 243, cleanup of prohibited expressions and typos

This Public Edition contains only the chapters on principles. The full edition, including the economic structure, internal procedures and items under review, is provided during adoption discussions. The Korean edition is the authoritative text.

Request the full edition Regional proposals
Cite as: LocalON OS Master White Paper, Public Edition v2.1 (12 October 2026), openkorea.co.kr/en/whitepaper/v2.1/